IOCL, Noida
New Mundra Panipat Pipeline (P-25) Project.( Group-1 : Mundra –Churwa and Churwa-NH15 (IPS1) Gujarat State
- Diameneter : 36 Inch
- Length : 190 Km
GSPL Transmission Limited, Gandhinagar
EPC Contract of Pipeline Laying and Associated Works for Anjar-Palanpur Pipeline Project (Section-I) (30” x 156 KM Approx.) for [insert description of the Project]
- Diameneter : 30 Inch
- Length : 156 Km
GAIL, Noida
Baruni Guwhati Pipeline Project Section-I
- Diameneter : 24 Inch
- Length : 138 Km
IOCL, Noida
HALDIA-BARAUNI PIPELINE PROJECT (GROUP-D)
- Diameneter : 30 Inch
- Length : 138 Km
GAIL, Noida
Bokaro Angul Pipeline Section-IV
- Diameneter : 30 Inch
- Length : 96 Km
GAIL, Noida
Dharmara Angul Pipeline Project Section-II
- Diameneter : 36 Inch
- Length : 35 Km
GAIL, Noida
Bokaro Angul Pipeline Section-V
- PMC : Mecon Ltd
- Diameneter : 30 Inch
- Length : 31.00 Km
HPCL , Mumbai
Barmer Palanpur Pipeline Project
- Diameneter : 18 Inch
- Length : 107 Km
HPCL
Hassan-Cherlapalli LPG Pipeline Project of HPCL as per Schedule-2
- Diameneter : 14 Inch
- Length : 146 Km
GIGL, Gandhinagar
Mehasana Bhatinda Pipeline Project on EPC Basis -Section-3
- Diameneter : 30 Inch
- Length : 150 Km
GIGL, Gandhinagar
Mehasana Bhatinda Pipeline Project on EPC Basis -Section-7
- Diameneter : 18 Inch
- Length : 100 Km
OPAL
Balance Works of the Hazira Dahej Naptha Pipeline Project
- Diameneter : 12 Inch
- Length : 43 Km
GAIL, Noida
Phulpur Haldia Pipeline Project (PHPL)
- Diameneter : 30 Inch
- Length : 159 Km
HPCL
Pipeline Laying and Associated Works of SV , IP stations for MDPL Capacity Expansion and Palanpur Vadodara Pipeline Extension Project for (Part-B).
- Diameneter : 18 Inch
- Length : 119 Km
GAIL, Noida
Jagdhishpur-Phulpur-Haldia Pipeline Project Part-B (Phase 1A) Bihar (JHPL)(including Ganga River HDD 2200 Mtr.)
- Diameneter : 24 Inch
- Length : 79 Km
GAIL, Noida
Ankleshwar Baroda Gas Pipeline Project (ABGL)
- Diameneter : 16 Inch
- Length : 93 Km
OPAL
EPC Naphtha Pipeline Project of 12″ Dia from GCPTCL to OPaL Dahej
- PMC : Mecon Ltd
- Diameneter : 12 Inch
- Length : 13 Km
NWRWS & KD
Engineering, Procurement And Construction (EPC) Contract For Tapi River Based Borisavar Lift Irrigation Scheme pressurized Irrigation Networks(Pins) For Songadh And Vyara Taluka Of Tapi District With Operation And Maintenance For 10 Years
- Diameneter : 1600 mm to 400 mm
- Length : 71 Km
WRID, Palanpur
Engineering, Procurement construction for pipeline Mansa Village to Dantiwada
- Diameneter : 2228 mm to 2276 mm
- Length : 31.80 Km
WRID, Bhuj
Engineering, Procurement construction for pipeline projcet Saran Reservoir
- Diameneter : 900 mm to 2700 mm
- Length : 72.46 Km
GWRDC
Madahvgarh Taluka Talod to Raygadh Taluka Himmtnagar
- Diameneter : 1500 mm to 800 mm
- Length : 104.77 Km
NWRWS & KD
SAUNI YOJANA – Phase – III, Link – 3 Package-7 Engineering, Procurement and Construction (EPC)
- PMC : MARS
- Diameneter : 106 to 24 Inch
- Length : 104 Km
NWRWS & KD
SAUNI YOJANA- Phase: III, Link – 4A, Package – 8 Engineering, Procurement and Construction (EPC)
- PMC : MARS
- Diameneter : 60 to 48 Inch
- Length : 91 Km
NWRWS & KD
SAUNI YOJANA : Link 4, Package-4: Engineering, Procurement and Construction (EPC)
- PMC : SGS
- Diameneter : 120 Inch
- Length : 30.68 Km
NWRWS & KD
SAUNI YOJANA : Link 2, Package-5: Engineering, Procurement and Construction (EPC)
- PMC : TUV SUD
- Diameneter : 120 Inch
- Length : 29.82 Km
NWRWS & KD
SAUNI YOJANA : Link 3, Package-6: Engineering, Procurement and Construction (EPC)
- PMC : MARS
- Diameneter : 120 Inch
- Length : 31 Km
NWRWS & KD
SAUNI YOJANA : Link 3, Package-4: Engineering, Procurement and Construction (EPC)
- PMC : MARS
- Diameneter : 120 Inch
- Length : 31 Km
NWRWS & KD
SAUNI YOJANA : Link 4, Package-2: Engineering, Procurement and Construction (EPC)
- PMC : SGS
- Diameneter : 120 Inch
- Length : 21 Km
Looking for a Trusted Pipeline
EPC Partner?
JSIW Infrastructure delivers end-to-end EPC solutions for oil & gas pipelines and
critical infrastructure. Let’s work together on your next project.