| Project Description : |
| Engineering, Procurement & Construction contract for 2PLRP-AHMEDABAD-MEHSANA Asset. |
1) 14” Pipeline from Mehsana CTF To Navagam CTF
Length : 77Kms. (Approx) |
2) 12” Pipeline from Kalol CTF To Navagam CTF
Length : 61 Kms. (Approx) |
|
| Project Duration : |
24 Months ( i.e 24.06.2010) |
| Project Value : |
143.84 Crores (35.1 million US$) |
| Client : |
Oil & Natural Gas Corporation (ONGC) |
| Scope Of Work : |
- Project Management,Pre-Engineering
- Survey, Residual Process Design,
- Detailed Design/Engineering
- Procurement
- Fabrication,Construction,Erection , Laying Installation, Painting,Hook-up, Testing
Pre-Commissioning and Commissioning
|
| Main Line : |
| 1) 14” Dia – 77 Kms. |
| 2) 12” Dia – 61 Kms. |
|
| CP System : |
TCP & PCP |
| HDD Crossing : |
| Sabarmati River - 14" 550 Mtr (Approx) |
| Sabarmati River - 12" 550 Mtr (Approx) |
| Narmada Canal - 14" 350 Mtr (Approx) |
| Narmada Canal - 12" 320 Mtr (Approx) |
|