Project Description :
Engineering, Procurement & Construction contract for 2PLP- Ankleshwar Asset.
1) 10” Pipeline from Akholjuni EPS To Laxmipura Tap Length : 65.00 Kms.
2) 8” Pipeline from Ankleshwar CTF To Gandhar CPF Length : 45.00 Kms.
Project Duration : 20 Months ( i.e 28.02.2010)
Project Value : 77.31 Crores (18.8 million US$)
Client : Oil & Natural Gas Corporation (ONGC)
Scope Of Work :
  • Project Management,Pre-Engineering
  • Survey, Residual Process Design,
  • Detailed Design/Engineering
  • Procurement
  • Fabrication,Construction,Erection , Laying ,Installation, Painting, Hook-up, Testing
  • Pre-Commissioning and Commissioning
Main Line :
1) 10” Dia – 65 Kms.
2) 8” Dia – 45 Kms
CP System : TCP & PCP
HDD Crossing :
Mahi River - 10" Dia 700 Mtrs. (Approx)
Narmada River - 8" Dia 1000 Mtrs. (Approx)