| Project Description : |
| Engineering, Procurement & Construction contract for 2PLP- Ankleshwar Asset. |
| 1) 10” Pipeline from Akholjuni EPS To Laxmipura Tap Length : 65.00 Kms. |
| 2) 8” Pipeline from Ankleshwar CTF To Gandhar CPF Length : 45.00 Kms. |
|
| Project Duration : |
20 Months ( i.e 28.02.2010) |
| Project Value : |
77.31 Crores (18.8 million US$) |
| Client : |
Oil & Natural Gas Corporation (ONGC) |
| Scope Of Work : |
- Project Management,Pre-Engineering
- Survey, Residual Process Design,
- Detailed Design/Engineering
- Procurement
- Fabrication,Construction,Erection , Laying ,Installation, Painting, Hook-up, Testing
- Pre-Commissioning and Commissioning
|
| Main Line : |
| 1) 10” Dia – 65 Kms. |
| 2) 8” Dia – 45 Kms |
|
| CP System : |
TCP & PCP |
| HDD Crossing : |
| Mahi River - 10" Dia 700 Mtrs. (Approx) |
| Narmada River - 8" Dia 1000 Mtrs. (Approx) |
|
|